Skip to main content
Kakira Sugar logo
Kakira Sugar

Welcome to Kakira Sugar

Uganda's leading producer of sugar.

Kakira Sugar is extracted from cane grown on lush plantations on the shores of Lake Victoria. The sweet, sparkling crystals with their distinctive taste and flavour, and rich golden colour, have sweetened dishes all over Uganda since the 1930s!

Kakira Sugar - there is nothing sweeter!

  • Home
  • About Us
    • Kakira at a Glance
    • Mission Statement
    • Our History
    • Our Brand
    • Kakira in the News
    • Guestbook
  • From Cane To Crystal
    • Agriculture
    • Expansion
    • Power Co-generation
  • Corporate Social Responsibility
    • For Our Family of People
    • To The Environment
    • The Farmers' Friend
  • Madhvani Group
    • Agro Industry
    • Consumer Products
    • Packaging
    • Hotels & Tourism
    • Services
    • Metal Processing
    • Corporate Social Responsibility
    • In Other African Countries
    • Future Projects
  • Contact Us

Power Co-generation

Kakira Sugar File
Kakira Sugar File
Kakira Sugar File
Kakira Sugar File

Generating Electric Power for in-house Use

Kakira is in the fortunate position being able to generate its own electricity so that its factory is self-sufficient.

Bagasse (the fibrous residue left after sugar-cane crushing) is burnt in boilers to produce high-pressure steam. This high pressure steam is then:

  • Used to turn the factory mill turbines, etc.
  • Passed through turbo-generators to produce electric power, after which.
  • The low-pressure steam is used in the sugar manufacturing process.

The electric power used in Kakira is hence generated from a renewable biomass energy source.

In 2005, Kakira had two 20 bar steam-driven turbo-generators (3 MW + 1.5 MW) in addition to 5 diesel standby generators.

2004-2008 Expansion to Generate Electricity for Grid Supply

As part of its 2004-08 expansion, KSW installed :

  • Two new boilers of 50 tonnes per hour steam capacity at 45 bar-gauge pressure, with all necessary ancillaries such as an Ash Handling System, a Feed water System and Air Pollution Controls (such as wet scrubbers and a 40m high chimney).
  • A complete Bagasse Handling system
  • A new 16+ MW 11KV double extraction condensing Turbo-alternator of type along with a cooling tower,
  • A new switch yard at Kakira with the necessary transformers and switch gear to supply power to the Kakira complex as well as the Ugandan grid
  • A dedicated new 14 km distribution line for grid supply at 33 KV.

The capacity of Kakira's expanded co-generation not only meets the entire increased needs of KSW's factory and infrastructure on a 24hr per day basis but also supplies up to 12 - 14 MW of electricity to the National Grid.

This project not only diversified the scope of the company's business, but also augmented its substantial contribution to the economy of South Busoga and, indeed, of Uganda.

Planned Further Expansion 2010-2012

There is a continuing deficit in electricity generation in Uganda and the national utility has undertaken emergency measures to supplement generation using diesel and heavy-fuel oil. Moreover, there is a growing demand for power in the country for development. 

Considering this situation and the need to increase the renewable energy supply whilst conserving fossil fuels and reducing carbon emissions, the Madhvani Group has decided to expand its electricity co-generation capacity.

The Kakira co-generation expansion envisages installing:

  • A new 160 TPH 67 bara(a) boiler
  • A new 30 MW double-extraction-condensing turbo-alternator
  • A new switch-yard for power distribution
  • An additional new 14 km distribution line for grid supply at 33 KV.

The large new boiler will effectively replace the five 20 bar(a) boilers (which will be placed on stand-by for any emergency or new system break-down).  Hence the bagasse burning efficiency will improve to generate steam at a pressure that is more than 3 times higher, thereby increasing its electricity generation potential.

All of the new equipment will be procured shortly and the expanded co-generation project is expected to be commissioned by July 2012, after which Kakira will supply around 32 MW electricity to the grid for 24h/d for at least 305 days each year.

KSW Image

Back to top of page

  • Madhvani Group
Previous Issues

Muljibhai Prabhudas Madhvani, MBE

(18th May 1894 - 11th 1958)

A tribute to celebrate the life and achievements of the Founder of the Madhvani Group

Five decades after his death, his legacy and philanthropy in Uganda still live on.

View this document
Previous Issues

Kakira Sugar - Sweetening Uganda Since 1930!

An ISO 9001 Certified Company

  • Home
    • Drupal.org
      • Drupal issue queue
      • Accordian Mini Panels issue queue
      • Administration menu issue queue
      • Advanced help issue queue
      • Automatic Nodetitles issue queue
      • Chaos tools issue queue
      • Charts issue queue
      • Colorbox issue queue
      • Compact Forms issue queue
      • Content issue queue
      • Date issue queue
      • Devel issue queue
      • Email issue queue
      • FileField issue queue
      • Global Redirect issue queue
      • Guestbook Views issue queue
      • Guestbook issue queue
      • IMCE Wysiwyg API bridge issue queue
      • IMCE issue queue
      • Image resize filter issue queue
      • ImageAPI issue queue
      • ImageCache issue queue
      • ImageField issue queue
      • Imagecache Canvas Actions issue queue
      • JS Alter issue queue
      • Lightbox2 issue queue
      • Link issue queue
      • Module filter issue queue
      • Node Reference URL Widget issue queue
      • Nodequeue issue queue
      • Open Flash Chart API issue queue
      • Panels issue queue
      • Path Filter issue queue
      • Pathauto issue queue
      • Popup issue queue
      • Quick Tabs issue queue
      • Rules issue queue
      • Splash issue queue
      • Token issue queue
      • Transliteration issue queue
      • Vertical Tabs issue queue
      • Views Accordion issue queue
      • Views Slideshow issue queue
      • Views attach issue queue
      • Views issue queue
      • Webform issue queue
      • Wysiwyg CCK Integration issue queue
      • Wysiwyg issue queue
      • dbfmgreybox issue queue
      • hoverIntent issue queue
      • jQuery AOP issue queue
      • jQuery Form Update issue queue
      • jQuery PopupWindow issue queue
      • jQuery UI issue queue
      • jQuery Update issue queue
      • popup message issue queue
  • 1 / 0 Current anonymous / authenticated users